1418 NW 65th St.
Seattle, WA 98117
About Ballard
Main Office
Office Phone: 206-252-1000
Fax: 206-252-1001
Ballard School Profile
Attendance Area School Attendance Area Map
School Leadership and Board District
Community Partners at Ballard 巴拉德高中的社区资源和项目
Continuous School Improvement Plan (C-SIP)
Ballard High School C-SIP
学校持续改善计划(C-SIP)是每所学校的行动计划 它确定了学校在当前和即将到来的学年计划重点关注的领域, 他们希望学生达到的成绩目标, 以及学校计划如何合作实现这些目标.
这些计划会定期更新,以反映每所学校正在使用的策略. 这个文件也可以作为我们的标题I学校全校范围内的改进计划.
School and Building Reports
School Report
Ballard High School Report
学校报告显示了一个学校学术发展的简要快照, student climate, accountability, family and staff engagement, and overall school performance. 学校报告由州公共教育监督办公室为该州的每个学校和地区制作,并在全年定期更新数据.
On state assessments, 期望参加但没有参加的学生, such as absences or opting out, are counted as non-proficient. 这可能会影响学校的整体水平评级.
Questions about school reports? Contact the Research and Evaluation Department research@88021y.com.
School Climate Surveys
Ballard High School Climate Survey
学校气候调查用于改善学校水平, climate surveys are given to all staff, students, and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.
Building History
Ballard Building History and Information
Asbestos Hazard Emergency Response Act (AHERA)
由于建筑物的年龄或以前的石棉减少项目, 没有已知的含石棉建筑材料(ACBM)在巴拉德高中大楼. 如发现任何可疑物质,请通知下列石棉指定人员.
As required under AHERA, 巴拉德高中必须保持石棉管理计划(AMP),并将其存档在学校. AMP可在周一至周五的上课时间进行审查.
Wendy Couture
Environmental Health and Safety Manager
wjcouture@88021y.com
206-252-0528
Discipline Dashboard
As part of Seattle Excellence, Seattle Public Schools’ Strategic Plan, 该地区致力于中断不合比例的纪律做法. 支持这项工作,提高透明度和问责制, 该学区为每所学校创建并发布了面向公众的纪律指示板,并于11月1日发布, 2021.
纪律仪表板数据反映了当前学年,并将在整个学年每季度更新一次. 如有任何疑问或疑虑,请联系具体学校的学校领导.
Academic Year: Current academic school year.
Accessible/Default:点击这里切换到仪表板的可访问版本.
Actions by Month:按月份和开除类型划分的纪律处分次数.
Actions:排除类型的纪律处分次数.
Attribute:学生属性(性别,种族/民族,所服务的特殊教育,504计划)
Days: Count of exclusion days for an exclusion type.
Days of Exclusion: Count of exclusion days.
Discipline Rate:至少有一次违纪事件的学生人数除以所有在校生人数.
E. Expulsions:学生属性的紧急开除次数.
Enrolled: Count of enrolled students.
Exclusion Actions:学生属性的排除操作计数.
Exclusion Days: Count of exclusion days for a student attribute.
Exclusion Type: Short-term suspension (SS), Long-term suspension (LS), Emergency expulsion (EE), In-school suspension (IS), Expulsion (EX), and Interim alternative education setting (IA).
Exclusionary Actions: Count of exclusionary actions.
Expulsions: Count of expulsions for a student attribute.
FERPA Compliance:家庭教育权利和隐私法合规. *
Incidents by Day of Week: Count of disciplinary actions by day of week.
Incidents by Grade: Count of disciplinary actions by grade.
Incidents by Hour: Count of disciplinary actions by hour.
Incidents by Exclusion Type:排除类型的纪律事件数.
Incidents by Student Attribute or Support Service: Count of disciplinary incidents. 有多少学生参与其中,事故就会被计算多少次.
Incidents per 100 Students:违纪事件数除以在校生数,再乘以100. 有多少学生参与其中,事故就会被计算多少次.
Rate: Discipline rate for an exclusion type.
School Name: School name.
Students:至少有一次违纪事件的学生人数.
Suspensions: Count of suspensions for a student attribute.
Weapons:涉及武器的纪律事件数目.
*请注意:当一个小组少于10名注册学生时, 至少两个最小组的所有值都将被抑制.
Ballard Levy Projects
BEX I
Levy Approved: 1995
卓越建筑I (BEX I)是首个卓越建筑资本征款. 1995年,西雅图选民通过了3.3亿美元的资本税来取代, 对整个地区的学校进行翻新和现代化改造.
Project Description
将原有的四幢大楼改为新的两层楼.
- Building Size: 240,100 gross square feet
- Capacity: 1,600 students (grades 9-12)
- Site Size: 12.7 acres
- Total Cost: $48.2 million
- Completion Date: September 1999
- Architect: Mahlum & Nordfors
- Contractor: Kiewit Construction Company
About BEX
卓越建筑(BEX)资本征费用于资助现代化或更换老旧建筑物的项目, fund technology for student learning, 处理整个地区的地震和安全问题以及主要的预防性维护需求.
BTA III
In February 2010, the $270M, six-year capital Levy, Buildings, Technology and Academics III (BTA III), garnered support from 73.45 percent of those voting in the Levy election. It was a renewal of the Buildings, Technology and Athletics (BTA II) Levy, passed by voters in February 2004.
- 2016:对现有跑道进行维修、重铺路面及重铺路面.
- 2013:进行外墙改善,包括修补屋顶, resealing windows and re-pointing masonry. Made upgrades for Special Education program.
BTA II
2004年,西雅图选民通过了BTA II资本税. 该基金资助了该地区每所学校近700个设施改善项目和技术升级.
- 2011:进行机械和照明改造,提高节能水平. Made safety improvements in science room.
- 2005: Greenhouse
BTA I
The $150 million Buildings, 科技及学术/体育(BTA I)资本征款于一九九八年二月获投票通过. BTA I在该市的每所学校资助了超过465个大小设施项目. The projects included safety and security upgrades, 更换屋顶和窗户,技术和运动场升级.
- 1999: PBX Systems, Clearing Equipment & Upgrades
About BTA
The Buildings, 技术和学术(BTA)资本税支持该地区的长期计划,以升级和翻新老化的学校设施,并解决入学人数增长问题.
BTA IV资本税于2016年获得选民批准. 正规的棋牌平台排行榜将从2017年到2022年获得这些税收基金.
Enroll at Ballard